So, here is my latest design work.  The layout is pretty much the same as the last update.  But, I took into consideration a couple tips from fellow modelers.  Mainly, the line to the dock does not run through the yard.  With the last design, I did not like how you would have to run through the yard to get to the Ore Dock.  Now, the line to the dock splits at Missabe Jct. - and has it's own line all the way to the dock.

I also added some better track design in the area of the Duluth Depot and Mott Mine.

A glimpse of a light at the end of the tunnel...

I am not saying that we are not moving.  I suspect a move is eminent.  But, exactly when we move is not yet known.  So, in the meantime, I have been getting very itchy to do some model RR stuff.

I have quite a few projects on my plate.  And, I will probably focus on these first.  But, I may start thinking about starting my layout.  Or, at least a small part of it (like the yard area).

For now...  God Bless......

(added November 09, 2007)